New Insights from a Delay Analysis for Cognitive Radio Networks with and without Reservation

TitreNew Insights from a Delay Analysis for Cognitive Radio Networks with and without Reservation
Publication TypeConference Paper
Year of Publication2012
AuthorsElmachkour, M, Kobbane, A, Sabir, E, Koutbi, MEl
Conference Name2012 8TH INTERNATIONAL WIRELESS COMMUNICATIONS AND MOBILE COMPUTING CONFERENCE (IWCMC)
PublisherIEEE; IEEE Cyprus Sect; Frederick Univ
ISBN Number978-1-4577-1379-8
Abstract

In wireless communication systems, the delay remains a crucial factor. In this work, we focus on the design of a new opportunistic cross-layer MAC protocol involving channels allocation and packet scheduling for cognitive networks in order to optimize system performance. Cognitive radio provides the opportunity for secondary users (unlicensed users) to use available portions of the licensed spectrum bands without interfering with primary users (licensed users). We consider that each secondary user is equipped with two transceivers. The role of the first transceiver is to obtain and exchange channels information on the control channel. The second transceiver is devoted to periodically detect and dynamically use the available data channels. The paper deals with channel allocation considering traffic characteristics of secondary users. So, we propose a mechanism of resource reservation to improve Quality of Service (QoS) requirements that favors successful secondary users to transmit data during x time slots without interfering with primary users. We develop a new analytical model, while taking into account the backoff mechanism. We analyze delay parameter for two scenarios with and without resource reservation. We show through simulations that our approach guarantees an optimal response delay.

Revues: 

Partenaires

Localisation

Suivez-nous sur

         

    

Contactez-nous

ENSIAS

Avenue Mohammed Ben Abdallah Regragui, Madinat Al Irfane, BP 713, Agdal Rabat, Maroc

  Télécopie : (+212) 5 37 68 60 78

  Secrétariat de direction : 06 61 48 10 97

        Service des affaires financières : 06 61 44 76 79

        Service des affaires estudiantines : 06 62 77 10 17 / n.mhirich@um5s.net.ma

        CEDOC ST2I : 06 66 39 75 16

       Contacts

    

    Compteur de visiteurs:655,672
    Education - This is a contributing Drupal Theme
    Design by WeebPal.