The integrated multi-plant production routing problem with simultaneous delivery and pickup

TitreThe integrated multi-plant production routing problem with simultaneous delivery and pickup
Publication TypeConference Paper
Year of Publication2020
AuthorsKhaoula, B, Mohammed, EA, Youssef, B
Conference NameProceedings - 2020 5th International Conference on Logistics Operations Management, GOL 2020
Mots-clésCustomer demands, Manufacture, Multi-plants, Plant production, Return flow, Reverse logistics, Routing decisions, Routing problems, Used product
Abstract

The Production Routing Problem (PRP) is concerned with coordinating the manufacturing, holding, distribution, and routing decisions to meet customer demands with an objective of minimizing the total operational costs for a defined period. The PRP can be expanded unaffectedly to concern reverse logistics and return flow processes, which typically consist on collecting used products or recyclable packaging from consumers to the depot or plant for a potential refurbishment, upgrading or recycling. Here, we will model and resolve to optimality the Multiple Plant Production Routing Problem in a Reverse Logistics context. © 2020 IEEE.

URLhttps://www.scopus.com/inward/record.uri?eid=2-s2.0-85100174617&doi=10.1109%2fGOL49479.2020.9314715&partnerID=40&md5=439e942e353af832a22471f4c9ac7fb3
DOI10.1109/GOL49479.2020.9314715
Revues: 

Partenaires

Localisation

Suivez-nous sur

         

    

Contactez-nous

ENSIAS

Avenue Mohammed Ben Abdallah Regragui, Madinat Al Irfane, BP 713, Agdal Rabat, Maroc

  Télécopie : (+212) 5 37 68 60 78

  Secrétariat de direction : 06 61 48 10 97

        Secrétariat général : 06 61 34 09 27

        Service des affaires financières : 06 61 44 76 79

        Service des affaires estudiantines : 06 62 77 10 17 / n.mhirich@um5s.net.ma

        CEDOC ST2I : 06 66 39 75 16

        Résidences : 06 61 82 89 77

Contacts

    

    Compteur de visiteurs:635,686
    Education - This is a contributing Drupal Theme
    Design by WeebPal.